Under ISM Code 13.7, what type of verification is required for an SMC when between the 2nd and 3rd anniversary date?

Prepare for the Port State Control Examiner Test. Access interactive flashcards and multiple-choice questions with detailed explanations and tips. Ensure your success!

Multiple Choice

Under ISM Code 13.7, what type of verification is required for an SMC when between the 2nd and 3rd anniversary date?

Explanation:
The mid-term check is called an intermediate verification. Under the ISM Code, an SMC’s five-year cycle is supported by several verifications: initial verification before the SMC is issued, annual verifications around each anniversary, and an intermediate verification that occurs specifically between the second and third anniversaries. This intermediate step is designed to ensure the ship’s Safety Management System remains effective and up-to-date mid-way through the certificate’s validity, before renewal considerations begin. Final renewal verification comes later, at the end of the five-year period.

The mid-term check is called an intermediate verification. Under the ISM Code, an SMC’s five-year cycle is supported by several verifications: initial verification before the SMC is issued, annual verifications around each anniversary, and an intermediate verification that occurs specifically between the second and third anniversaries. This intermediate step is designed to ensure the ship’s Safety Management System remains effective and up-to-date mid-way through the certificate’s validity, before renewal considerations begin. Final renewal verification comes later, at the end of the five-year period.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy